Hello everyone.
We work on multi-residential projects and the typical set-up is that the unit/apartment models are loaded in the towers, while the towers are in turn loaded in a central file. I usually work on the central file for dimensioning, annotation, sheets, etc.
As with typical floors, layouts are the same. Whenever I copy dimensions and keynotes from one floor to another, the unit models are being loaded in the central file and it takes a long time before the whole operation is completed. In the end, I have to go to the Link Manager and remove these links.
Is there a way to copy-paste dimensions and keynotes without triggering this duplicating behavior?
Thanks.