My architects have asked me to create one schedule (to rule them all) that will help with their COMChecks. They need the
- Square Footage of floor slabs
- SF of roofs, by type if applicable, or just total if all the same material
- SF of opaque wall (exclude area of windows and doors)
- SF of windows
- SF of curtainwall
- SF of doors
To my knowledge, this is looking like multiple schedules, correct?
Is there a way to tie in all the areas into one schedule after make them?
Would this be much easier in Dynamo?