Assigning material to directshape took long time and more than 25GB memory

Assigning material to directshape took long time and more than 25GB memory

Anonymous
Not applicable
482 Views
4 Replies
Message 1 of 5

Assigning material to directshape took long time and more than 25GB memory

Anonymous
Not applicable

I have more than 98 directshapes (meshes) in a revit file. I want to assign materials to them.
It took long time and more than 25GB memory to run, and it failed because it’s out of memory.

Revit and DY files is here: https://drive.google.com/open?id=1htv2aFaQK_1Y4L1Jbe-60gBq_IjmTE6A

0 Likes
483 Views
4 Replies
Replies (4)
Message 2 of 5

joe_keogh
Collaborator
Collaborator

DYN File is corrupt when I download

Joe Keogh
Director | Design Technology + Innovation
www.viewlistic.com.au

0 Likes
Message 3 of 5

Anonymous
Not applicable

Hi Joe,

 

I re-tried the dyn file from google drive, it works.

The DYN is attached.

 

0 Likes
Message 4 of 5

joe_keogh
Collaborator
Collaborator

Still no good, which version of Revit are you using?

Joe Keogh
Director | Design Technology + Innovation
www.viewlistic.com.au

0 Likes
Message 5 of 5

Anonymous
Not applicable

revit 2019, Dynamo for revit 2.1.0.6567 on my woek PC

But it can also been open on my home PC with Dynamo for revit 2.0.3.

 

1.png

0 Likes