Message 1 of 6
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I am trying to Make a schedule that gives me the total length of a certain type of rail in my project. However I have a family that uses this "railing " (Modeled in the family as a generic extrusion because I can't get actual railing into the family) that I also want to include in my schedule. There is a fixed amount of railing in each instance of this family. Is there any workaround that I can use to schedule both the railings length and the railing within my family instances to get a grand total within my project?