Message 1 of 3
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hello,
We're using Vault 2016 + Plant 3D 2016 with a MSSQL backend for Plant projects. I'm trying to programmatically determine within a Plant addin when the Plant project currently open is out of sync (i.e. files have been changed in the vault). I'm writing some code that requires the project to be in sync and therefore need a way to check this prior to executing the code. The actual synchronization can be performed via the 'PLANTREFRESHFROMVAULT' command--what's the most reliable way to check in code if my local project is out of sync with Vault?
Thanks in advance,
Will
Solved! Go to Solution.