Hi,
I'm not good at English. Please look attached images.
I think that both injection and packing are wrong.
And unfortunately there are some number is missing. Anyway, I do the best for fixing.
(1)Injection speed profile dialogue
You should start full-charged position. (see moldflow help)
57, 53 and 15 are left column top to bottom.
I think that this condition sheet is TOSHIBA/SHIBAURA injection molding machine's one.
VSB means suckback(=screw retracting after metering) velocity.
LS10 means suckback length. So you don't need to input these values.
I guess LS4B is exist on actual machine but missing. That number is VI2 to VI3 change position and which is larger number than LS4. Section between LS4B and LS4 is VI3.
I attached an example of profile dialogue(1st picture, this is not reflect VI3).
(2)Holding profile dialogue
TRH means each holding time. TRH1 is PH1's time. TRH2 is PH2's time, and so on.
And "INJECTION" Timer controls total holding time. (see 3rd picture).
Total holding time is (INJECTION Timer - actual injection time).
In this case, injetion time is 1.23sec(lower left corner of molding condition sheet),
total holding time is 12 - 1.23 = 10.77 sec.
Therefore 10.77 - (0.6+1.1+1.6)=4.77 <- PH4's time
Regards