Please make it possible to add datum work points to points in an assembly level sketch.
I know it is possible to make a sketch in a part and then add datum work points to that part sketch in an upper level assembly. But that doesn't always work. For example, if the sketch in the upper level assembly needs geometry from multiple parts.