Message 1 of 3
Show BOM with Delimeters on drawing
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hello,
In the Bill of Materials I have it set to All Levels with Delimeters, but is there any way to make it carry over to drawing BOM? It exports to excel better from the drawing BOM table. Thank you, -Phillip
