- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
We use a lot of phantom assy's which include positional constraints, for instance a boltset (includes the bolt, washer spring washer and nut) where we can select the needed clambing range (for example 6mm between bolt head and washer). This boltset includes an iMate which coresponds with an iMate in some sheetmetal part. The boltsets are placed automaticly in the main assy by means of an addin, where the user can select the clambing range prior to placing the boltsets.
I've noticed that my main assy, where I place around 300+ boltsets, takes a lot of time saving when there's a positional constraint selected. Over 10 minutes to save...... when setting all positional constaints to master, the save command only takes a couple of seconds. Due to calculating the mass and centre of gravety it takes ages to save.
Is there an other way for this boltset to get the same result. Automatic placemant is mandetory, we use a lot of fasteners 😇 for instance; the 300+ boltsets are placed (and constraint) within a minute, including setting the positional constraint!
At this moment we use 2020 inventor, but tested the same setup on a 2024 inventor with same result.
Solved! Go to Solution.
