CABLE AND HARNESS SUBASSEMBLY

3 REPLIES 3
Reply
Message 1 of 4
mustafaSNRRQ
276 Views, 3 Replies

CABLE AND HARNESS SUBASSEMBLY

mustafaSNRRQ
Enthusiast
Enthusiast

Hello,

I have an assembly that contains cables and harness, it is connected from pins to other pins. My question is, is there a way of having this cable and harness as a sub assembly separate than the assembly that i have, and then add it to the assembly by using constraints? or cable and harness have to be done directly on parts?

0 Likes

CABLE AND HARNESS SUBASSEMBLY

Hello,

I have an assembly that contains cables and harness, it is connected from pins to other pins. My question is, is there a way of having this cable and harness as a sub assembly separate than the assembly that i have, and then add it to the assembly by using constraints? or cable and harness have to be done directly on parts?

3 REPLIES 3
Message 2 of 4
blandb
in reply to: mustafaSNRRQ

blandb
Mentor
Mentor

Are you wanting to use this same harness in a different assembly?

Autodesk Certified Professional
0 Likes

Are you wanting to use this same harness in a different assembly?

Autodesk Certified Professional
Message 3 of 4
mustafaSNRRQ
in reply to: blandb

mustafaSNRRQ
Enthusiast
Enthusiast

I attached below an image. I want "1" , "2" and the wires to be under one sub assembly because i want to name it all as one sub assembly. And then add it to the assembly that i have there by using constraints i guess. Because when i want to do the exploded view, i don't want to select each of "1" , "2" and the wires to tweak them, plus in the inventory of our company "1" , "2" and the wires have one part number rather than a part number for each.

0 Likes

I attached below an image. I want "1" , "2" and the wires to be under one sub assembly because i want to name it all as one sub assembly. And then add it to the assembly that i have there by using constraints i guess. Because when i want to do the exploded view, i don't want to select each of "1" , "2" and the wires to tweak them, plus in the inventory of our company "1" , "2" and the wires have one part number rather than a part number for each.

Message 4 of 4
blandb
in reply to: mustafaSNRRQ

blandb
Mentor
Mentor

If I am following what you are saying, your harness is an assembly, so if your items "1" and "2" are placed inside the harness, it will all be a sub-assembly. When you open the harness sub-assembly the connectors and wires should all be there as one unit.

Autodesk Certified Professional

If I am following what you are saying, your harness is an assembly, so if your items "1" and "2" are placed inside the harness, it will all be a sub-assembly. When you open the harness sub-assembly the connectors and wires should all be there as one unit.

Autodesk Certified Professional