Bolt pre-load applied after the applied loads?
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi,
I'm running a few tests using the bolt connector tool in Fusion 360's simulation before I start using this in more complex models. I'm modelling a 1000mm long hollow steel tube (48mm ID, 70mm OD) with a bolt running through the middle. Firstly, a 45mm diameter bolt with an applied pre-load of 279477N, modeled using the connector tool. The cross-sectional area of the tube is 2039mm^2, so expected stress under pre-load is 137MPa, screenshot below. End displacement was also as expected from hand calculation at 0.65mm. All looks great so far!
Next I took the case of the tube without the bolt but loaded by a force of 300000N applied at each end to put it into compression, Theoretical stress expected 147MPa, displacement 0.7mm. Fusion gave 135MPa stress, end displacement of about 0.66mm, see below, not exact but ok.
I then ran a case with both the pre-loaded bolt and the 300000N load. This gave stresses of 272MPa and end displacement of 1.3mm. This is a simple addition of the previous two cases which implies that the pre-load is calculated and applied after the application (and hence compression of the tube) by the externally applied load.
This is rather odd as the majority of cases the bolts on a connection will be tightened and the pre-load locked in and then the loads applied to the structure. This means that in these "real world" cases a compression load, such as that modeled above, will reduce the stretch of the bolt and hence reduce the applied pre-load. This should have reduced the stresses and the displacement from that given here.
As the pre-load is actually applied after the forces I think that things like allowing a user defined "Elastic modulus" and "coefficient of thermal expansion" won't have any noticeable affect on the results. Indeed the whole "connector" option at the moment doesn't seem to do much more than apply a set of opposing forces equal to the pre-load to the bolt and nut locations. This would be an order of magnitude more useful and realistic if the pre-load was calculated (which basically represents tightening the bolts) before the structural loads are applied to the structure.
Perhaps I'm missing something. Is there a way to get fusion to apply the pre-load (tighten the bolts on the joint) and then apply the externally applied loads as would be the case for the majority of situations with pre-loaded bolts?
Thank you for your guidance in advance!
