As for tool numbers.
To give a little more info, this is at my friends shop. I was working with him more when he got the machine and helped get it set up and running and programmed some projects in Fusion 360 and HSMworks.
I did have it running programs generated by F360 and this post processor and even drill ops which has me a little confused. With that said I feel like I remember there being a check box or easy way to switch to expanded cycles. Maybe I'm wrong but whatever the case I just did a new post of one of those old programs I ran and it includes Q and R so either the machine used to accept these and doesn't now, or I had it running expanded cycles.
Anyway I haven't been involved for a while and he found the internal programming got him by well enough to not want to deal with CAM for the jobs he was doing.
Now I'm trying to get everything set up properly to try to get F360 CAM operational again.
Adding that context because when I was first working with the recently acquired machine we didn't have much more than 8 tools and just moved them around in the tool list so they were always 101, 202, etc.
Now however the tool list is getting at least into the 40s. He has his own system of numbering set up and has that working with his operations programmed directly in the machine. So now it would be a lot more inconvenient to need to move tool 33 in the tool list to position 3 for turret 3, and then keep track of what is where, what needs to be moved back, etc.
I will admit this is outside my area of expertise and maybe we are doing it wrong or could be doing it better I also don't have all the nomenclature.
I am assuming by station 7 you mean the physical tool spot 7 on the turret itself?
Then assuming that is correct, and in the tool list we have tool #33, if I call up 3307 the machine loads offsets, tool angle, etc, assigned to 33 in the tool list and it rotates to tool position 7.
If I call tool 107 it loads offsets and info from tool list tool #1 and rotates to physical tool position 7.
As far as I know this means that to get tool offsets and info in tool list #33 to work with 707 I would need to move the existing tool 7 in the tool list, copy, and paste tool 33 into 7. This seems less convenient generally but would also require him completely changing his existing workflow, organization, tool numbering system, etc.
https://www.facebook.com/groups/1229995573786339/