Message 1 of 6
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I was wondering if there is a way/trick to change the feed rate in the same operation.
I attached a sample part. I'm doing an adaptive clearing and at the beginning of the operation the tool is taking big chuncks of materials so need to go slow. But when the tool start cutting the dome is barely touching the part so I was wondering if there is a way / trick to increase the feedrate in that area.
Thanks
Solved! Go to Solution.