Drilling operation calculating incorrect feed distance
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hello, I've been using Fusion for the past 2 years for machine runtime estimation and in the last 4-5 months I've been noticing that drilling cycle times have been horribly inaccurate. It's bad enough to the point where I usually just calculate drilling time by hand at this point.
I have a part that was saved as an example of good speeds and feeds for running Nitronic 60. In this example, there are qty 6 holes, Ø.209", that are drilled 0.9" deep. What I get for a drilling cycle time on just that operation is just over 13 minutes.
Looking at the feed distance for the operation shows the problem, somehow Fusion is calculating that the total drill depth for these 6 holes is 79" of travel at 6" per minute. There is zero pecking in the operation, so ideally the feed distance should be ~6" total.
Does anyone know why the feed distance is more than 13x of what it should be?
Also, why does clicking the "Use Feed per Revolution" cause Fusion to calculate the drill feed rate to be something insane like drilling at 100" per minute? Clicking that toggle makes the 13 minute run time drop down to a 5 second run time, which is also not right.