Message 1 of 10
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I'v attached my project. The screw rotates and the die nut runs along the thread. The motion link combines the two and ensures the distance travelled relates to the screw pitch. The problem is the die nut rotates with the screw. The design has a 'shoe' that runs in a rail but any attempts to make this a slding joint gives the joint conflict message an no clues as to why.
I've tried a motion link to try to combine the two joints with no luck. Ive tried applying the joint for the shoe before the threaded joint, also no luck. No doubt a simple solution but I can't find it Im afraid.
(Joint Cyl18 and Motion Link 19)
Thanks
Pete
Solved! Go to Solution.