I created a model of a workbench using parameters for all dimensions and a detailed drawing for it with 8 sheets. I then decided to convert it to a configured model so I could adjust the size of the bench and see the changes . I realize that a drawing can only have one configuration (as I understand it anyway) . When I update the model for the original configuration that the drawing was created from, the "drawn date" is not updating in the title block of the drawing for that configuration. Other attributes like drawing name and the dimensions are updating correctly, just the date that is stuck on the date I converted it to a configured design even though I have made several changes to the design over several days. Anyone know how to fix this behavior?

 

I should also mention that I created a new dummy design from the same configuration that the drawing that has the title block problem, and it has the current revision date for the "drawn date" attribute so this tells me that the model has the correct date associated with it.

0 Likes
Accepted solutions (1)
552 Views
9 Replies
Replies (9)
Message 2 of 10

ClintBrown3D
Autodesk
Autodesk
Accepted solution

Hi @patl1 


Welcome to the forums. 

“drawn date” is a drawing specific attribute property. It’s the date that the 2D drawing was created, it’s not linked to the model. 

 


Clint Brown
Senior Product Manager - Autodesk Fusion



Book some time on my calendar
The Ultimate Guide to Drawing Automation
0 Likes
Message 3 of 10

patl1
Enthusiast
Enthusiast

Thank you. I guess that makes sense from the name itself (duh?). I was
hoping for an attribute to show the last time a drawing was changed as part
of a simpler rev control rather than the model revs which change every time
I save a change to the CAM but don't affect the CAD side (i.e. dimensions). Guess I'll have to manually type it in on all the sheets

0 Likes
Message 4 of 10

mcdZPKHQ
Participant
Participant

Is there a solution for this without the Manage Extension?

0 Likes
Message 5 of 10

Pramod.kadam
Autodesk
Autodesk

@mcdZPKHQ ,

Can you please elaborate on the request? What behaviour are you looking for?

 

Thanks,



Pramod Kadam
Product Owner
Fusion 360 Drawings
0 Likes
Message 6 of 10

mcdZPKHQ
Participant
Participant

Sure.

A MODIFIED_DATE attribute would be helpful.

 

Title block

fusion-title-block.png

Attributes

fusion-attributes.png

 

Examples from Rhino:

%<Date("d.M.yyyy")>%

%<DateModified("d.M.yyyy")>%

 

rhino-attributes.png

 

 

0 Likes
Message 7 of 10

Pramod.kadam
Autodesk
Autodesk

Hi @mcdZPKHQ ,

Sure, got it. We will add this request in the backlog. Thanks for sharing details.

cc: @sandipdumbare 

Thanks,



Pramod Kadam
Product Owner
Fusion 360 Drawings
Message 8 of 10

ClintBrown3D
Autodesk
Autodesk

Hi @mcdZPKHQ 

 

While you wait. Take a look at this date option. Note that it would need testing and is not officially supported. https://clintbrown.co.uk/2023/07/25/fusion-360-drawings-last-save-date/


Clint Brown
Senior Product Manager - Autodesk Fusion



Book some time on my calendar
The Ultimate Guide to Drawing Automation
Message 9 of 10

gtprototype
Advocate
Advocate

When I create new pages in an old drawing the "drawn date" on the new page doesn't reflect the date it was created --is this by design?

Dale Speakes
prototype technology
0 Likes
Message 10 of 10

mcdZPKHQ
Participant
Participant

Exactly. That bothers me too. 😡

0 Likes