Design for Autodesk - Fusion360

Design for Autodesk - Fusion360

Anonymous
Not applicable
4,127 Views
51 Replies
Message 1 of 52

Design for Autodesk - Fusion360

Anonymous
Not applicable

Hello

I am writing to enquire about reward for submitted and approved project. I completed and submitted my project on 10th of February. To this day I didn't get any response on my email from Autodesk but on the challenge's website I have this answer: "Multi Purpose Training Bench is Approved - Europe Payment". Would you please tell me what I should to do? Thanks you in advance.
Regards
Paulina

0 Likes
4,128 Views
51 Replies
Replies (51)
Message 41 of 52

Anonymous
Not applicable

Hi,

I have the same problem.

Thanks. 

0 Likes
Message 42 of 52

Anonymous
Not applicable

Hi,
I have the same problem. I've posted my project 21 May, and received the answer 23 June, but never the payment.
Thanks.

0 Likes
Message 43 of 52

Anonymous
Not applicable

Hi, I have the same problem, my project has been approved 23 June, but I did't received payment.

Thanks. 

0 Likes
Message 44 of 52

brianrepp
Community Manager
Community Manager

As @digiphis mentioned, they're working as fast as possible processing payments.  Thanks for the continued patience!

0 Likes
Message 45 of 52

Anonymous
Not applicable

Thanks fo the answer. You can know more o less how much time have to wait? 

0 Likes
Message 46 of 52

Anonymous
Not applicable

Hello

 

I have a different problem. My project was denied, and i'm really confused about that because i've read requirements several times and i'm sure i met them all.

My mailbox is empty, so i have no confirmation of this decision yet i think. Can you please check this and give me answer? It would be great 🙂

0 Likes
Message 47 of 52

digiphis
Autodesk
Autodesk

@Anonymous

 

Hello.  I see your submission was not accepted.  I took a look at your fusion file and the reviewer's notes.  He'd noted that you didn't meet Guideline #3 - which states that you need to model the inside as well as the outside of something.  I can see you actually did that - but the reviewer also has notes saying your gears are messed up, which is quite true.  Why did you choose to model straight gears instead of bevel?

 

I will now approve your model because it meets all other guidelines and I happen to like that the windmill, gears, shafts, and generator are all connected and spin together.  For anyone else reading this - yes - we do look at your model in great detail to make sure it meets all the posted guidelines.

 

Bunkier - since the program is over you're not going to receive an automated "accepted" email and I'm going to have to put you into a manual batch.

 

For anyone else wondering about approvals and payments - we are just about done with European models and will be sending out an email to everyone saying whether or not their models were approved.  Sorry it's been a while.  There have been 10X as many submissions as we thought there would be and it's been... complicated to get them done.

 

Regards,

Autodesk

 

 

Message 48 of 52

Anonymous
Not applicable
Thank you for quick response. I'm very happy and now will be waiting for approval and email.

Regards
0 Likes
Message 49 of 52

Anonymous
Not applicable

Hello!

 

I would also like to know why my D4A project was denied, because I was left without any explanation. I am certain that all of the requirements was met, so I do not understand this denial. Can you check this and give me some feedback, please? I would be very grateful.

 

Regards,

Wojtek.

0 Likes
Message 50 of 52

Anonymous
Not applicable
Hello friends,

As I see I'm not alone in this situation. Email is empty, my project is denied with no explanation and no reason in my opinion. I was studying requirements in detal today in search of some possible mistakes and found nothing. It would be very nice if You could look at this for a second, and give me explanation, even for educational purpose.

Regards.
0 Likes
Message 51 of 52

johnekka511
Community Visitor
Community Visitor

I'm facing the same problem😶 I submitted my project 3 months ago but the project still not reviewed and there is no any kind of verification mail from the other side. Should I wait for the response also, someone suggest me that if you lac of system requirements. Then Fusion 360 can be a issues to create or send projects then I look at the time system requirements of Fusion 360 through this:  https://www.webtechcoupons.com/fusion-360-system-requirements/

Now what should I do? Should I wait for the response?

0 Likes
Message 52 of 52

TheCADWhisperer
Consultant
Consultant

@johnekka511 

What is the link to the rules for this?

This thread is 6 years old  - is this still active in the rules?

0 Likes