Message 1 of 3
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi
I have two projects: A1 and B1. The A1 project is used inside the B1 project. Easy.
I have a need to save and project A1 to a new A2. I have to have the old version and the new one (with special modifications) under different names.
Does anyone know the procedure how to also save project B as B1 so that the new version of project B2 is linked to project A2? As a result, I need two pairs of projects: B1 with linked A1 and B2 with linked A2.
Thanks for the help.
Regards Tomasz
Solved! Go to Solution.