Hi Forma team
I would like to suggest improving the workflow and data continuity between Forma Site Design and Forma Building Design
Our typical early design workflow starts in Site Design, where we create the overall massing, study building areas, compare options, and run site-level analyses. As the project develops, we may need to take one or more buildings into Building Design for more detailed space planning while still keeping the overall project in Site Design
Currently, I see a few limitations in this workflow:
1. 3D Sketch to Building Design
We often start with basic masses in Site Design and then convert them to 3D Sketch to develop the massing further
However, once a building becomes a 3D Sketch, it seems that we cannot continue the workflow by taking that developed building into Building Design
It would be very useful if a 3D Sketch could be transferred or converted into a Building Design model while preserving its geometry and basic information
2. Preserve Building Design area data in Site Design
This is probably the most important issue for our workflow
For example, a project may contain several buildings. I may want to develop only one of those buildings in Building Design while keeping the rest as Site Design models
After developing that building and defining its spaces, areas, units, floors, and other information in Building Design, I still need Site Design to understand that data
Ideally, Site Design should be able to read the Building Design model's area and program data so that project-level calculations and analyses can include all buildings together, regardless of whether they are Site Design or Building Design models
For feasibility studies especially, maintaining continuous area data such as GFA and program distribution across the entire project is very important
3. Bidirectional editing between Site Design and Building Design
It would also be very useful if transferring a building to Building Design did not make the workflow one-directional
Sometimes after developing a building in more detail, we still need to return to the overall site and adjust its massing, footprint, position, orientation, or other early-stage parameters
Ideally, Site Design and Building Design could remain connected, allowing us to make appropriate changes from either environment while keeping the models synchronized
In general, I think a more connected workflow between
Site Design → 3D Sketch → Building Design → Site Design
would be extremely valuable
The goal is not necessarily to have every Building Design feature available in Site Design, but to maintain geometry and data continuity throughout the design process
This would allow us to start with site feasibility and massing, develop selected buildings in more detail, and still return to the overall project to analyze all buildings together without losing information