It seems you copied the Process Flow from Jason's answer in this other post or some other model that got it from there.
- You apparently copied the Process Flow into the "Basic Processor" template without removing the default activities. The old Source activity is causing error messages.
- The Process Flow is designed to work with a BasicFR object. You placed a visual shape that does not port-connections and does not have Entry/Exit events. Replace it with the correct object type (found in "Advanced" tab of library).
- Remove the conveyor that currently links the other two conveyors together and instead connect them through the BasicFR.
- Resample the entry and exit events and assign the entering item to the "item" label in the Wait For Entry activity.
- Adjust the coordinates in the Change Visual activity to fit the size of the BasicFR.