Message 1 of 3

Not applicable
11-10-2011
06:41 PM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi, I'm trying to understand what is mean of the different report results of "transportation" and "Machine".
I am trying to reproduce a concrete batch plant with 2D Layout factory.
I have a Sand BIN, a Cement Silo and a Concret Mixed.
To try I put the Mixer with a energy consumption 1kW.
Then at the Routings for the operation of mixer I put 60minutes.
There are two Mixer Jobs, then I think could be 120 minutes.
When I display the "Machine" report appears 250KWH.
I have tried every way, and cannot understand why happens this.
Any idea?
Attached the file.
Solved! Go to Solution.