I think it would be great if the rebuilding of grading groups could be controlled just like surfaces.
I am modifying the base feature line for my grading and the grading updates with each PI insert which means it takes about 10-15 mins sometimes to insert 1 point.
I found a thread from 2010 talking about this but I still cant find a good solution to this other then redoing the grading when modifications are needed.