Message 1 of 7
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have a corridor with grading to the existing surface with a 'headwall' surface pasted in. I would like to grade to a the top of the headwall as to fill the space between the corridor and the headwall rather than grade at 1:3 to daylight.
Any solutions? TIA
Solved! Go to Solution.