Message 1 of 5
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi I currently have an existing survey with building footprints shown. I need to make a plan where we demolish the buildings and leave a 10 foot deep hole (to represent the foundation of the building post demo). What would be the best way to do this? I drew a feature line around each building and got the elevation data from the existing data, but I'm not sure what to do next.
Solved! Go to Solution.