reorder assembly construction

reorder assembly construction

lambertb
Collaborator Collaborator
830 Views
2 Replies
Message 1 of 3

reorder assembly construction

lambertb
Collaborator
Collaborator

I placed a couple points later one in my creatiuon of an assembly. It seems like the layout generic link doesn't recognize the marked point because I added it later. Is there a way to re order the creation of the assembly?

Thanks.

C3D 2022 and 2024
0 Likes
831 Views
2 Replies
Replies (2)
Message 2 of 3

KMercier_C3D
Advisor
Advisor

In the Assembly Properties (right click on assembly > Assembly Properties) go to the Construction Tab, here you will see the order that they are being applied. In order to move the pieces into the correct order close the Assembly Properties. Click on the subassembly piece that you want to move and right click and select Move To then click on the point that you want that piece to attach to (to be listed immediately after).



Kati Mercier, P.E. | LinkedIn | AutoCAD Civil 3D Certified Professional
Pronouns: She/Her
Co-author of "Mastering AutoCAD Civil 3D 2013"
AU2019 Speaker::: CES321590: Analyze and Revise Existing Subassembly Composer PKT Files for AutoCAD Civil 3D
AU2017 Speaker::: CI125544: Analyze and Devise in Subassembly Composer
AU2012 Speaker::: CI3001: Reverse Engineering with Subassembly Composer for AutoCAD Civil 3D
AU2011 Speaker::: CI4252: Create Subassemblies That Think Outside the Box With Subassembly Composer for AutoCAD® Civil 3D®

0 Likes
Message 3 of 3

lambertb
Collaborator
Collaborator

Does this work if the piece is in the correct location just wrong order? Can you move to the same location.

C3D 2022 and 2024
0 Likes