What assembly recommendations and approach to the corridor for a mil & overlay project when the roadway centerline does not follow the crown of the road?  This is a state project and requires the states centerline and stationing be used throughout the plans.  Generally, the existing grades will be followed except where PROWAG will require corrections in the pavement running and cross slopes at ADA crossings too.  There are a few areas that will require curb replacement due to deterioration.  Sidewalks are being added or removed & replaced along the entire project.

 

C3D 2022, latest updates

WIN 10 Pro

0 Likes
168 Views
1 Reply
Reply (1)
Message 2 of 2

Jeew-m
Mentor
Mentor

Overlay mill and level 2 subassembly supports a separate target for crown target alignment.



Jeewana Meegahage
Design Engineer
Autodesk Civil 3D Tutorials
Facebook | YouTube | LinkedIn







0 Likes