Hello, I have a dredge project that I am doing and the the corridor I am using works for most everything expect on thing. I don't want my corridor to fill in areas that are lower that the specified elevation (-46). So if a portion of the channel has elevations lower than that, I want my proposed surface to tie into the -46 and then leave the existing lower elevations as it. I will attach a few photos for reference. Is there anyone that can help with this? My corridor has linkwidthslope subassemblies that are connected with mindaylight (3:1) assemblies. Please see below. Thank you in advance!