it is ok to bring an existing job, just pretend it is new.
67 lots- and since i am lucky enough to know your jurisdiction and your
talent pool i would say you could break it down this way:
1) ebase houses points, surface (eg)
2) parcel base that houses just proposed parceling
3) pbase that houses surfaces, corridors, profiles, pipes, etc. shuffle
data share of (eg)
4) E+S "base"
5)SWM/TR-55 Pre --shuffle (eg)
6)SWM/TR-55 Post --shuffle (eg)
7) "sheet" drawings housing xref combos of above as appropriate
I'm stabbing quickly here, but if I make absolutely no sense let me know.
I think for 67 lots, despite all the sticky hands that want to stick
themselves in the pot, you should be able to tackle it without vault.
--
Dana Breig Probert
http://civil3drocks.blogspot.com/
CADapult Ltd
Empowering Design With Innovative Solutions
www.cadapult.net
----------------------------------------------