Good Afternoon,
I'm in the process of reviewing some training manuals to try and find this answer, but I am completely new to creating custom subassemblies. I have worked with profiles and basic road coordidors in the past, however nothing custom. We are working to try and learn to create custom assemblies to improve modeling and material takeoffs/bidding for our clients.
I am trying to create a concrete trench with a retaining wall on one side (the is above the grating height) and a tie on the opposite that will project a line to connect to a feature line (or other geometry point with a fixed elevation) - see attached sketch.
My main design issue is the relationship between the profile and top of wall. The top of wall (P1) and top of grading (P2/P5) are fixed elevations (which are shown on the sketch). The depth of the trench (P3/P3) vary along the profile (slopes down into a sump). I'm not sure how to create this relationship because the built in sub assemblies assume the trench is a fixed depth and therefore the top of the wall is xx' above the bottom of the tench always (as opposed to being a varying in order to meet a fixed elevation).
Also, P6 needs to project a line/slope to the right to meet a fixed existing elevation. I can represent the fixed elevation as a feature line, or whatever object is required to allow it to project and tie to it.
Any help or suggestions would be appreciate! Thanks!