I am working on a roadway resurfacing project to determine the as-built cross slope of the roadway is within a given tolerance. As the roadway goes into a curve, the critical points vary as the roadway superelevates. I need to verify the slopes at these critical stations along the alignment (normal crown, removed crown, fully superelevated, etc). I have been running a corridor section points report to get this information on whole stations (example STA: 102+50.00). Is there a way to have this report return data for user specified stations (example STA: 102+49.85), vs the specified whole number intervals (25’, 50, or 100’)?
Solved! Go to Solution.