Hi
I'm trying to improve on an 10km existing road that need to be rehabilitated.
Following an autodesk example for rehabilitation a assembly that includes overlay, shoulder, dayligth basin and conditional subassemblyes was created.
However I have problems as that sohwn on the attached section view!!!
In excavation I need to have side drainage ( I choose dayligthbasin) but on fill......
can someone help me about this issue an explain what should be corrected on the assembly?
Another isuue is that the initial assembly has all the lines (PT conditional) suddenly the lines desapeared as the image shoes (PT conditional_2)! Why?
Thanks
Alvaro Lopes
Solved! Go to Solution.
Solved by Jeew-m. Go to Solution.
Dear Friend,
There is a subassembly called ditch. In that you can choose whether the drainage is run in cut fill or both.
Thanks
Thnaks
Before your answer I used ditch subassembly and this is what result!
But now is better than before.
Rgds
AL