Is there anyway.. WBS numbering could be automatic ? Right now it doesn't have WBS numbering system. Another request is being able to transfer one WBS structure to other project would be very helpful. If possible importing the WBS from MS Project/Primavera could save a lot of time. P6 is very powerful scheduling tool, being able to import P6 WBS structure might better perform in terms of scheduling aspects.
P