Idea:
I propose we need to be able to select which BIM 360 3D views we want to clash when copying or uploading a model to a Coordination Space.
Context:
At this time this functionality is not implemented which means that BIM 360 auto-generates clashes for all 3D views it finds in the uploaded models. Models to be coordinated in our projects however contain more 3D views then only clash set views, because coordination is about more then clash testing alone. Therefore BIM 360 is needlesly calculating and generating clashes that aren't relevant to us. We should this be able to tell BIM 360 beforehand which views to include in the clash detection process and which to ignore. The ignored views however we want to be able to visualize them still in the same way as the other clash views.
Example:
At our office we have a general 3D view for each discipline which contains all visible elements for that discipline. However we make seperate 3D views which each contain only a subset of elements that need to be part of a certain clash set (ventilation ducts / pipes / doors / doors usage spaces / opening elements / ...). So lots of small 3D clash set views. This gives us granular control over clash exploration. The general 3D view however is not to be included in the clashing because it would make clashes to be generated twice. The general view however is useful to get an overview of the entire discipline which is larger then only the elements to be clashed. And as said before, coordination is about more then clash detection alone.
Can't find what you're looking for? Ask the community or share your knowledge.