Certain checklists need to be completed periodically along the lifespan of a project. Example being a rope inspection checklist. The lifting equipment needs to be inspected once per quarter, with a sign-off next to each item.
There are also instances where multiple signatures are required for the checklist.
Both of these functionalities are fairly important for consideration.