Why is continuous scrolling the "back-up" option through BIM Viewer? This should be the norm, not the exception. I understand that both options are available, but scrolling - in my opinion and shared by many in the field - is the preferred method of reviewing lengthy documents. Additionally - there is no ability to mark up in the BIM Viewer.
This is not an acceptable response.