Message 1 of 12
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
What is the difference? and can I use BIM360 with switchback?
Electrical contractor
I receive AutoCAD 2017 MEP from MECH
I receive Revit 2017 from ARchi
I receive a Navisworks model with everything Pre-applied.
I use Revit 2016
Need to switchback for coordination, over 1000 clashes
I have BIM 360 using with a colleague in other city. and we use the same model.
Thank you,
Solved! Go to Solution.

