Extra Instrument tagging called up in Instrument Schedules

Extra Instrument tagging called up in Instrument Schedules

ace_guru
Advocate Advocate
378 Views
1 Reply
Message 1 of 2

Extra Instrument tagging called up in Instrument Schedules

ace_guru
Advocate
Advocate

Hey Folks,

 

Just admitting up front that all my experimentation in Plant 3D 2020 is purely based on Trail and Error.

 

Image below show typical flow meter symbol being used...

ace_guru_0-1645074136715.png

My question is, when an instrument schedule is printed how many entries should there be for the flow meter? Currently I've got 5. One for the flow meter and then another 4 for each of the tagging associated with it.

ace_guru_1-1645074584053.png

 

Hope I'm just doing something wrong and there's a simply fix to only show one entry per instrument, cause there's about an extra 3 pages of unnecessary info.

 

 

Cheers,

 

0 Likes
379 Views
1 Reply
Reply (1)
Message 2 of 2

h_eger
Mentor
Mentor

Dear @ace_guru ,

 

No, you are doing everything right.
a pipe connected part of the mechanical flow meter
and 4 x instrumentation marking

Results in 5 parts for the flowmeter in the database - all correct.

-

If my reply was helpful, please give a "Kudo" or click the "Accept as Solution" button below (or both).

Hartmut Eger
Senior Engineer
Anlagenplanung + Elektotechnik
XING | LinkedIn

EESignature



0 Likes