Global change of the absolute path of hyperlinks

Global change of the absolute path of hyperlinks

dani_cs
Advocate Advocate
132 Views
2 Replies
Message 1 of 3

Global change of the absolute path of hyperlinks

dani_cs
Advocate
Advocate

Hello All,

 

this is my issue. I have a drawing with 637 blocks. Each one has a hyperlink attached to a .JPG image file. Those hyperlink follow an absolute path, so, is there a way to global change the absolute path to a relative path of each hyperlink?

 

thanks in advance

0 Likes
133 Views
2 Replies
Replies (2)
Message 2 of 3

imadHabash
Mentor
Mentor

Hi,

You may try to fill the relative path in Hyperlink base at Summary tab from the Application button >> Drawing Utilities >> Drawing Properties.

Imad Habash

EESignature

0 Likes
Message 3 of 3

dani_cs
Advocate
Advocate

Hi,

 

I tried to fill that field but nothing happened, hyperlink paths are still absolute

0 Likes