Requires additional processing of many reports to meet the standards of the company.
Here is an example of the project:
The total number of sheets - more than 300
Scheme - 30 sheets
Drawings cabinets - 12 sheets
The remaining sheets of the project (more than 258) - Reports.
It takes a very long time to manually on standards draw such a large number of sheets of reports. Application process must be automated.
In electrical engineering projects a lot of different reports.
Reports are very important in the manufacture. They are used for the procurement of the necessary components; during assembly the product and installation of wires and cables; for programming, validation and testing ...
Automatically generated and executed by the standards of the company reports significantly reduce development time and improve the quality of projects.