We have a large project that is being detailed in 3 or 4 separate phases.
If we detailed the first level and issued the drawings for it, then how can I renumber the rest of the job without re-numbering the previously detailed items?
We are required to produce drawings for the separate levels on the job as we work our way up, so we are going to face this problem all the way up the building.
Any guidance would be greatly appreciated, thanks all.