How to add a drawing to an existing drawing???

4 REPLIES 4
SOLVED
Reply
Message 1 of 5
Dias_Antonio
964 Views, 4 Replies

How to add a drawing to an existing drawing???

Dear Colleagues

 

In many shop drawings there is the need to add drawings to an existing drawing... How can I perform this.

Everytime I generate a drwaing, a new drawing is inserted in drawing´s list inside Drawing Manager.

 

Does anybody here faced this problem?

 

Thanks for the help.

- Marque "Aceitar como Solução", caso tenha resolvido seu problema.


- Select "Accept as Solution", if it has soplved the problem.


- Clique em "Curtir" se a resposta ajudou.


- Click on "like" if the answer helped.


 


Antonio Dias


|Linkedin|Instagram|Facebook|Twitter|YouTube|


Colaborador da Comunidade de Usuários Autodesk Brasil

4 REPLIES 4
Message 2 of 5
markhubrich
in reply to: Dias_Antonio

You can drag & drop details from one sheet to another in the Document Manager. 

...and fix the kiss export issues.
Message 3 of 5
markhubrich
in reply to: markhubrich

You can also create the detail directly to an existing sheet... 

 

ADDTOEXIST.JPG

...and fix the kiss export issues.
Message 4 of 5
Dias_Antonio
in reply to: markhubrich

Thank you very much...when the drawing is generated by Drawing Process, is not possible to add to an existing Drawing. At least this is what is ocurring in AAS 2018...

- Marque "Aceitar como Solução", caso tenha resolvido seu problema.


- Select "Accept as Solution", if it has soplved the problem.


- Clique em "Curtir" se a resposta ajudou.


- Click on "like" if the answer helped.


 


Antonio Dias


|Linkedin|Instagram|Facebook|Twitter|YouTube|


Colaborador da Comunidade de Usuários Autodesk Brasil

Message 5 of 5
AleckGiles
in reply to: Dias_Antonio

HI,

 

What @markhubrich is showing is a drawing process. The Process Properties box always appears after selecting a process. Then you can click the PLUS icon to add a list of drawings to be filled before starting new sheets. The system will still start a new sheet if it thinks the next view will not fit on any of the existing drawings. It only checks the existing drawings once, so once a view appears on a new sheet all further views will do the same.  This hasn't changed in at least 6 years so can be done in 2018 too.

 

Aleck Giles, Structures Consultant, Graitec
Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.

EESignature


LinkedIn

Can't find what you're looking for? Ask the community or share your knowledge.

Post to forums  

Autodesk Design & Make Report