Hello,
I wonder why the schedule parameter "level" doesnt exist in the list of available fields when I try to list the walls and columns in my project (two different schedules).
For all other objekts in the project (e.g. floors, windows and doors) I can choose "level" as a field and sort objects by level.
The walls are modeled as seperate objects for each floor.
Thanks
I never understood why, but this is not possible… just reed this blog article and
wait for the addin by case http://autodesk-revit.blogspot.fr/2012/11/cant-schedule-wall-constraint-part-2.html
!!!!
Walls and Columns both have the parameter Base Constraint. It should substitute for your desired Level info in most cases. If you schedule it, you can even change the name of the schedule column header to "Level" if you want.