I created schedules inc. cost for Light fixtures, Lighting control etc. For each of the 3 schedules I was able to add the cost (based on the cost I put into the family). The problems I'm having are:
i gooled but didn't find a way to estimate cost, but think thsi could easily accomplished since Revit has all the data that are needed.
what is the reason stopping you to duplicate the schedules and remove cost parameter from the schedule placed on sheet.
it would clutter up my project by doubling the number of schedules, and it still would not add up the total cost of the project (or discipline, or phase)
would it be feasible for you to do all these cost analysis in Excel (after export).
You can reload the data from revit into excel sheet whenever you model gets changed.
this all is possible as a workaround. The same as me manually adding up the $-values in the schedules. but this all contradicts the idea of revise-instantly.
My plan is when i delete 9or add) an item, i see instantly what the cost impact is. It seems this would be easy to add for Autodesk. they could make a function to add all cost of each phase etc.
but it seems they haven't implemented something like that and we have to use manual workarounds. So this would be good for the future to add.
Thanks for your advise anyway. it seems there isn't a satisfying solution at the moment.