Tip - Work with longer timelines

Tip - Work with longer timelines

schneik-adsk
Community Manager Community Manager
685 Views
3 Replies
Message 1 of 4

Tip - Work with longer timelines

schneik-adsk
Community Manager
Community Manager

The March updated added "Activate" to the context menu.

That makes working with longer timelines easier.

 

Now, double click on a component you want to work on in the graphics.

RMB and choose "Activate"

The timeline will filter to only the features that contribute to the one component.

 

ssp_temp_capture copy.png

Kevin Schneider
686 Views
3 Replies
Replies (3)
Message 2 of 4

Anonymous
Not applicable
Nice. Can we get a shortcut like a double click? Pretty please?
0 Likes
Message 3 of 4

cekuhnen
Mentor
Mentor
thanks for pointing this out - I had no idea what activate should do.

Claas Kuhnen

Faculty Industrial Design – Wayne State Universit

Chair Interior Design – Wayne State University

Owner studioKuhnen – product : interface : design

0 Likes
Message 4 of 4

Anonymous
Not applicable

What about double RMB? Functionality to select and activate component. If you do it on the background it would activate document component (top level or whatever we call it)!

0 Likes