Hello.
I need to customize my revision schedule so that it appears a certain way in our titleblocks. The titleblock was provided by the owner and their revision table is built from the bottom up and right to left. I know you can sort a revision schedule from bottom to top, but I am not sure how to split it to continue to the bottom right after revision #4.
I initially thought I could create 8 revision schedules, placing each schedule for each line in the titleblock, but there is no filter option to filter out unwanted numbers. I can use any and all advice on how to bulid a bottom up, right to left revision schedule.
Thanks