In Project Setup there is a section for P&ID DWG Settings and Plant 3D DWG Settings which correspond to two separate databases in SQL as well. This made sense pre-2017 when there were two products, but that is no longer the case. There should be one single database for everything. Using a pump as an example, Pump P-1000 on the P&ID should be the exact same pump P-1000 in the Model PERIOD. All Properties that are on the P&ID pump such as Flow Capacity, Dynamic Head, Voltage, Phase, Frequency, etc. should also be on the same pump in the model. If I change the Flow Capacity on the Model, it should change on the P&ID and vice-versa because it is the same exact pump and data in the database. I should not need a Service List in P&ID and a Service List in P3D - because it is one database and therefore one single list. In Report Creator I should see all the Equipment in both the P&ID and the Model even if a tank is in the Model and not on a P&ID yet or vice-versa. One database, one data for all. Is that not how BIM is supposed to work? The only thing that keeps it from working in Plant 3D is the fact that the two databases have not been combined and since the software was combined in to one in 2017, then there is no reason whatsoever the database cannot be combined today. I should be able to go to a Gate Valve, see all the the Properties regarding that valve as well as the P&ID Symbol preview and setup with a single setup of the Tag format plus the P&ID Valve Annotation as well as the Orthographic Annotation. All data whether that valve is in the P&ID, the Model or Both. No need for P&ID Object Mapping - they are already the same objects. No need for Pipe Spec Object Mapping - they are the same object. No need for Validation of Property Mis-Matches - they are the same object. No need for duplicate information and entries - they are the same object. No need for separate reports - they are the same object. One Single Place for Settings. One Single Database. One True BIM Solution. Simplified Project Management with Fewer Opportunities For Potential Mistakes. It is time to merge the settings and the database together and make Plant 3D the undisputed Standard in the Process Industry.
Show More