My company loves Design Checker because it allows us to find out problems in our files without having to spend hours digging down for them. We also hate it because we can not longer ignore our problems. One thing we would like is that if Design Checker could be run from inside of Vault and for it to create a report for us that list out the fails and accepted fail. If we had this add-in then when a boss gives us a job to make a change on a assembly, we can run Design Checker on the assembly before pulling out and see what shape the assembly is in. That way we can give our bosses a better estimate of how much time it will take to fix the problems. This way we don't have to explain why a job took 2 weeks instead of 1 day, plus we would have a report to back us up.