I have an IFC file i am trying to load for a client to calculate Steel Tonnage in the steel framing schedule, However,when i add my Steel Tonnage Calculated Value(W*L/2000) to the schedule, the length and Steel Tonnage parameter are blank with no calculated totals. I have check that my sorting tabs are correct as well as length is set to round to nearest 1/16", count and Steel tonnage have calculated totals box checked.I have used this technique many times before, But something is not right.Any help is greatly appreciated.
*I am not sure if it is user error or something in the File the client sent over?
Respectfully,
Edward M