Relatively new to Revit material content for quantity and cost estimating. When creating a material takeoff schedule, structural steel elements are fairly straightforward, but other materials seem to be more difficult to calculate weights. For example ¼” diamond plate on a structural steel mezzanine doesn’t seem to have a Material: Unit weight field value in the schedule. There doesn’t appear to be a place in the family to contain or calculate a weight so on the schedule the value is zero.
This limits the ability to simply generate a total weight of these materials. In general it seems like field data for quantity estimating is inconsistent between families (or doesn't exist at all).