Message 1 of 4
Hidden line behavior in structural framing
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi,
I have next situation:
2 steel frames which are cut by another beam:
This results in plan view:
How can I control the line behavior of the overlapping part to ignore the hidden lines and let the symbolic dashed line take over?
Checking off hidden lines in the VG is no option, because I will lose hidden lines were they are needed.